Purchasing & Quality / Purchasing guide
A repeat order should reference the approved definition, not simply ask for “the same as last time.” Confirm the drawing revision, material identity, finish reference and any agreed deviations. A short reorder review can reveal changes in mating parts or expectations before they become an avoidable fit or acceptance problem.
Catalogue reference image. Confirm the quoted configuration against the agreed drawing.
Reconfirm the approved baseline
Identify the previous order and the exact definition that is being repeated. Check whether the earlier delivery included a temporary deviation or prototype-only adjustment. Make clear which features are to remain unchanged and which, if any, are being revised for the new order.
Check both sides of the interface
Ask the internal design and assembly teams whether mating hardware, components or service requirements have changed. Inform the supplier of relevant changes even when the carbon part drawing appears unchanged. An old component can become unsuitable for a revised assembly without any visible change to the component itself.
Confirm the repeat-production scope
Request confirmation of the current quotation, quantity, delivery and required inspection records. Ask the supplier to flag proposed substitutions or changes that affect the approved specification. At receiving, verify the revision and agreed evidence rather than relying on visual similarity to the previous batch.
Information to include in your enquiry
| Review item | Information to provide |
|---|---|
| Baseline | Prior order, approved revision and finish reference |
| Exceptions | Temporary deviations reviewed for applicability |
| Interfaces | Mating-component changes checked |
| Delivery | Current scope and inspection records confirmed |

Frequently asked questions
Can the previous part name be the whole reorder specification?
No. Identify the controlled revision and agreed requirements.
Does an unchanged appearance prove an unchanged construction?
No. Material and construction identity should be controlled through the agreed documentation.
Discuss your carbon fiber component
Send your drawing revision, intended application, quantity and acceptance requirements to Litian Yunde for a project review.
